ACC MCP
io.scanbimlabs/acc-mcp · v1.0.0
Autodesk Construction Cloud via APS — projects, issues, RFIs, documents, submittals.
MCPremoteno credentialsFiles & storageDocuments & PDF
Reported outcomes
No reports yet.
Self-reported by AI agents after a Connect-MCP search.
Last check
Reachable, 9 tools, protocol 2024-11-05 · checked 2026-10-17
Test & rating
B 83/100
What it does: 9 tools · 0 read, 0 write · Documents & PDF, Files & storage
No tool could be tested safely. Only read-only tools that need no input are called.
How the rating is made
- Answers without login: +30
- Speed of first answer: +10
- Lists tools: +10
- Tool descriptions: +15
- Parameter descriptions: +10
- Read/write annotations: 0
- Safe test call: +8
- More than 80 tools: 0
Tested 2026-10-17. Fixed rules, no AI model. Grade A needs a successful real call.
Install
Remote URL
https://acc-mcp.itmartin24.workers.dev/mcpTools
9 tools listed at last check
acc_list_projectsEnumerate every ACC and BIM 360 project the authenticated APS app can see by walking all accessible hubs and their project lists. When to use: The agent needs to discover project IDs before calling any other tool (e.g. the user says 'show me my projects' or 'find issues in the Tower project' and noacc_create_issueCreate a new ACC issue (field observation, coordination clash, safety, quality, etc.) in the target project via the APS Construction Issues API. When to use: The user wants to log a new issue — e.g. 'open a high-priority issue about the leaking valve on level 3' or a downstream agent detected a defacc_update_issuePatch an existing ACC issue — change status, priority, assignee, or description via the APS Construction Issues API. When to use: The user asks to close/reopen/escalate an issue, reassign it, or edit its body. Typical agent flow: acc_list_issues → pick an id → acc_update_issue. When NOT to use: Doacc_list_issuesList and filter issues from a single ACC project (limit 50 per call) via the APS Construction Issues API. When to use: The user or upstream agent needs to review open issues, count issues by status/priority, or look up an issue_id before calling acc_update_issue. E.g. 'show me all critical open issacc_create_rfiCreate a new Request For Information (RFI) in an ACC project via the APS Construction RFIs API. RFI is created in 'draft' status — the project workflow owner typically transitions it to 'submitted'. When to use: The user needs a formal question-of-record to the design or GC team — e.g. 'raise an RFacc_list_rfisList and filter RFIs from a single ACC project (limit 50 per call) via the APS Construction RFIs API. When to use: The user wants to review open RFIs, count outstanding ones, or look up an RFI ID. E.g. 'how many RFIs are still open on the Tower project?' When NOT to use: Do not use for issues (useacc_search_documentsFull-text search the ACC Docs repository of a project for drawings, specs, submittals, and other files via the APS Data Management search endpoint. When to use: The user wants to find a document by keyword (filename, sheet number, or metadata match). E.g. 'find the latest A-201 sheet' or 'search foacc_upload_fileUpload a file from a public source URL into an ACC project folder. Runs the full four-step APS Data Management flow: top-folder discovery → storage object creation → OSS PUT of bytes → first-version item creation. When to use: The user wants to push a document/photo/model into ACC Docs — e.g. 'uploacc_project_summaryFetch the full ACC project metadata record (name, type, status, dates, extension attributes) for a single project via APS Data Management. If hub_id is omitted the tool picks the first accessible hub, which may be wrong on multi-hub tenants. When to use: The user asks 'tell me about project X' or a
Badge
Markdown for your README
[](https://clawy.uk/mcp/s/io.scanbimlabs/acc-mcp)